Skip to content
Snippets Groups Projects

testing/ruff: upgrade to 0.0.284

Merged Celeste requested to merge Celeste/aports:upgrade-ruff into master
All threads resolved!

1 test failed:

thread 'message::gitlab::tests::output' panicked at 'Could not diff paths', crates/ruff/src/fs.rs:75:14

Could it be due to the CI_PROJECT_DIR environment variable?

I checked the last testing/ruff merge request (!46453 (merged)) and the pipeline failed there as well, but i can't view the CI logs to confirm if this was the same test that failed as they have been archived.

Since May this has been upgraded without going through the Gitlab CI, so i checked the last build log, and this test doesn't seem to have any problem on the builder.

Edited by Celeste

Merge request reports

Merge request pipeline #174242 skipped

Merge request pipeline skipped for 857cc8ae

Approved by

Merged by Kevin DaudtKevin Daudt 1 year ago (Aug 11, 2023 10:25am UTC)

Merge details

  • Changes merged into master with 857cc8ae.
  • Deleted the source branch.

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading